MENU
Intersection of the main laboratory crosscut with experimental chambers ZK-3S and ZK-3J
Experimental chamber ZK-2
The main laboratory crosscut with a groundwater inflow measuring point
Intersection of the main BZ-XIIJ crosscut with the BZ1-XII laboratory corridor
altern
Hydrogeological monitoring point (inflow measurement)
Access crosscut BZ-XIIJ, right: hydrogeological monitoring point
Experimental chamber ZK-1
Fully equipped part of the main access tunnel
The B-1 shaft on the 12th level of the Rožná I mine
Entrance area of the Bukov URF near the B-1 working